ARMS® on Mobile®
Install Now
ARMS® on Mobile®
ARMS® on Mobile®

ARMS® on Mobile®

AOM

App Size: Varies With Device
Release Date: Jul 27, 2016
Price: Free
3.6
469 Ratings
Size
Varies With Device

Screenshots for App

Mobile
The latest Mobile solution from Laminaar Aviation Infotech Pvt. Ltd. is an extension of the ARMS® V2 Suite. A state-of-the-art mobility solution that offers Airlines and Air Operators access to various Crew specific information from across various sub- systems of the ARMS® V2 Suite. AOM provides data to end-users in real time, as well as offline mode. The same investment can also enable the use of rapidly proliferating "Mobile Smartphone Devices" for other functions as well, e.g., for Cabin Crew, MNE Crew and Load Masters, etc., all controlled by a unified Backend Server infrastructure.
“ARMS® on Mobile®”- comprises the Server-side components and the Mobile-side (Client) application. The other big advantage of “ARMS® on Mobile®” is that it is an integral part of the ARMS® V2 Suite; which means it can seamlessly integrate with all the other sub-systems of ARMS® Suite thereby offering a truly integrated end-to-end Mobility solution.
Show More
Show Less
ARMS® on Mobile® 2.4.9 Update
2023-04-04 Version History
Bug fixes and performance improvements.

~Laminaar Aviation Infotech
More Information about: ARMS® on Mobile®
Price: Free
Version: 2.4.9
Downloads: 36116
Compatibility: Android 7.0
Bundle Id: aom.armsproject
Size: Varies With Device
Last Update: 2023-04-04
Content Rating: Everyone
Release Date: Jul 27, 2016
Content Rating: Everyone
Developer: Laminaar Aviation Infotech


Whatsapp
Vkontakte
Telegram
Reddit
Pinterest
Linkedin
Hide