Traffic Driver - For real raci
Install Now
Traffic Driver - For real raci
Traffic Driver - For real raci

Traffic Driver - For real raci

Traffic Driving game is the best Driving experience which you can enjoy

Developer: SDR studio
App Size: Varies With Device
Release Date: Aug 7, 2020
Price: Free
Price
Free
Size
Varies With Device

Screenshots for App

Mobile
Traffic Driver: Speedy is the most realistic drift racing cars game of endless arcade racing. Drive a top-class sports car and enjoy full of exciting challenges, show your racing and driving skills and become the professional drift car racers.
Show your rivals that you are the best in real competition with amazing speed with fast and beautiful cars, so start racing in arcade style, perform amazing stunts. Unique mix of arcade action and simulation way of driving.This racing with other cars in traffic is the best mobile racing game, you have been looking for. You drive your sports car through the endless traffic and realistic environment.
Traffic Driver: Speedy is the latest cars racing game, where you experience the real feel of chasing and drifting, avoid crashing and stay intact for as long as you can. On the way, make sure to stay ahead by using the Nitro Booster and complete all the challenges before you run out of time.
In this Heavy Traffic Racer: Speedy game drive your car smoothly through Heavy traffic, earn cash, upgrade your cars and buy new sports cars and upgraded those ones, try to be one of the fastest drivers in all over the world. Drive Speed plus cars of your choice. Run your sport elite car smooth and be fast to perform car play and be one of the fastest drivers and get fastest driving experience in heavy traffic drive zone.
Endless car play racing is now about to redefined!
In Traffic Driver: Speedy game Race carefully and avoid to hit any vehicles and road fence, if you hit road fence or any vehicle, you will not be able to complete the mission, so drive fast as you can and complete the mission as soon as possible without collision, overtake closely and get reward in the form of points, these points are very important to upgrade new vehicles.

KEY Features of the GAME:

- Stunning HD graphics
- Smooth and realistic car handling
- 3 Detailed Environments: Highway, Desert, Greenland
- Real gravity and physics while drift racing

GAMEPLAY INSTRUCTIONS

- Touch accelerate button (on Right side) to accelerate
- Touch brake button (on the left side) to slow down
- Tilt to steer





Traffic Driver Speedy will be updated constantly. Please rate and give your feedback for further improvement of the game.
Show More
Show Less
More Information about: Traffic Driver - For real raci
Price: Free
Version: 0.1
Downloads: 108
Compatibility: Android 4.4
Bundle Id: com.CarTraficReser.TraficRider
Size: Varies With Device
Last Update: 2020-08-07
Content Rating: Everyone
Release Date: Aug 7, 2020
Content Rating: Everyone
Developer: SDR studio


Whatsapp
Vkontakte
Telegram
Reddit
Pinterest
Linkedin
Hide