Brain Training Physics Puzzles
Install Now
Brain Training Physics Puzzles
Brain Training Physics Puzzles

Brain Training Physics Puzzles

Physics-based draw line puzzles with endless levels and brain skills tracking.

Developer: Dima Lechinsky
App Size: Varies With Device
Release Date: Jul 7, 2019
Price: Free
Price
Free
Size
Varies With Device

380+ challenging levels

Excellent brain training puzzles!

Test your mental abilities and stability over time. Try to solve physics-based logic puzzles. The rules are very simple. All levels are divided into groups of 20 levels. Try to get a maximum rating of 60 stars.
From time to time, return to this application and compare current results with previous ones.

Puzzle rules:

Draw shapes to solve challenging based on physics laws and logic puzzles.

1.The goal is just to hit two colored balls.
2.Any line based design that you draw become physical objects that can interact to any another physical objects.
3.Only one line can be used at the same time.
4.Created physic line can be removed as part of puzzle solution.
5.After the line is removed another line can be created.
6.Just 2 points are needed to create the line (start and end of straight line)

- Very suitable to small phone screens.
- Includes "camera" mode and grid option to allow precise line drawing.
- Original score system gives possibility to test your logic skills.

Music by Eric Matyas
www.soundimage.org
Show More
Show Less
Brain Training Physics Puzzles 1.0.69 Update
2022-06-28 Version History
Added 3 and Any level events

~Dima Lechinsky
More Information about: Brain Training Physics Puzzles
Price: Free
Version: 1.0.69
Downloads: 15094
Compatibility: Android 4.4
Bundle Id: com.dimalegames.Bump_Balls_Draw_Line_Free
Size: Varies With Device
Last Update: 2022-06-28
Content Rating: Everyone
Release Date: Jul 7, 2019
Content Rating: Everyone
Developer: Dima Lechinsky


Whatsapp
Vkontakte
Telegram
Reddit
Pinterest
Linkedin
Hide