Extreme Car Racing Games 2023
Install Now
Extreme Car Racing Games 2023
Extreme Car Racing Games 2023

Extreme Car Racing Games 2023

Extreme Car Race 3d Real Cars Racing Drifting Burnouts with Real Traffic Racer.

Developer: YiHan
App Size: Varies With Device
Release Date: Jan 27, 2022
Price: Free
4.2
1,280 Ratings
Size
Varies With Device

#1 racing on a traffic-packed highway!
Extreme Car Driving Game 2023
A mix of lifelike physics of extreme car driving, which has been the center point of Asphault Borne, eye-catching graphics and extreme driving on packed roads is what Asphault Borne has to offer.

-Fast cars
-Sports car
-Asphalt racing
-Multiplayer racing
-Realistic driving experience.

CAMPAIGN MODE. Immerse yourself in the world of street racing.
- Check out Texas deserts, visit Australia, France or Russia. A number of countries are there on your way to success.
- Divulge activities of secret organizations and destroy Winston’s empire
- Find out what the Syndicate is after and knock down their plans before it’s too late
- Make new friends who can help you in your endeavors

LOTS OF CARS TO CHOOSE FROM.
- New sports cars are awaiting your command: sports classic, regular vehicles, muscle cars and powerful super cars.

REALISTIC PHYSICS. Feel the power drive at your fingertips.
- Well tuned physics will allow you to feel every horsepower of the car of your choice.
- Adjust your vehicle to make sure it drives the way you want it
- No other game can give you the kind of emotions you’ll experience with Asphault Borne.

Drive fast cars To Become no 1 traffic racer and beat other traffic racers in real racing on offroads and racing tracks.
Use Nos and show your extreme car driving skills.

Drive sports cars in street racing tracks and upgrade sports cars need for speed real racing car driving.
Show More
Show Less
Extreme Car Racing Games 2023 25.0 Update
2023-12-08 Version History
Added:
- New Tracks
- New Sports Car.
- Avatar Selection

Enhanced Gameplay and Controller


~YiHan
More Information about: Extreme Car Racing Games 2023
Price: Free
Version: 25.0
Downloads: 479922
Compatibility: Android 5.1
Bundle Id: com.lgs.racing3D2022
Size: Varies With Device
Last Update: 2023-12-08
Content Rating: Everyone
Release Date: Jan 27, 2022
Content Rating: Everyone
Developer: YiHan


Whatsapp
Vkontakte
Telegram
Reddit
Pinterest
Linkedin
Hide