1. Checking the readiness of the PUO/ZO for unloading/loading
2. Checking the binding of the FPU/ZO to the trailer
3. Getting a list of available timeslots for performing a PRR
4. Timing for the PRR and registering the trailer in the schedule
5. Navigation through the territory of the warehouse
6. Receiving SMS-notifications about the progress of the PRR