APLOWBS:Beyond ToDo  WBS Tool
Install Now
APLOWBS:Beyond ToDo WBS Tool
APLOWBS:Beyond ToDo  WBS Tool

APLOWBS:Beyond ToDo WBS Tool

A WBS application for managing all hierarchized information.

Developer: Potamion
App Size: Varies With Device
Release Date: Jan 22, 2017
Price: Free
Price
Free
Size
Varies With Device

Why can't you execute a task in ToDo list ?
The answer is very simple, the task isn't subdivided enough to do.
APLOWBS enable you to decompose every task and manage it in executable units.



■Manage tasks in a hierarchical structure simply
You can subdivide a task to up to 5 classes with APLOWBS.
You can save the status of the task, so you can easily grasp the current achievement degree about it.
In addition, it isn't necessary for you to input the information except the task because APLOWBS has only really necessary functions.

■Excellent usability
You can easily realize a transposition or the deletion of the task by intuitive operation
including drag & drop, swipe.
It is rare that you feel stress because you can change hierarchy or status of plural tasks
collectively.

■Only yours WBS
For example, you can use APLOWBS for examination of travel plan or the document constitution,
categorization of shopping list.
Of course, you can use this as a simple ToDo list or memorandum too.
It is you to decide how to use APLOWBS.

■Design
You can't resist touch the icon.
You can't resist use this application to see top screen.
The green-based design with unity let your feeling refresh.



The life is a series of projects.
APLOWBS will surely help you step forward to the small one step for accomplishment.
Show More
Show Less
APLOWBS:Beyond ToDo WBS Tool 1.3 Update
2020-05-06 Version History
■Ver.1.3
-Added a function to connect projects and tasks and output them in CSV format. If you share it with a PC, you can use it as an input to create a Gantt chart in Excel.
* It is necessary to allow storage write permission.

~Potamion
More Information about: APLOWBS:Beyond ToDo WBS Tool
Price: Free
Version: 1.3
Downloads: 970
Compatibility: Android 4.0.3
Bundle Id: com.potamion.simplewbs
Size: Varies With Device
Last Update: 2020-05-06
Content Rating: Everyone
Release Date: Jan 22, 2017
Content Rating: Everyone
Developer: Potamion


Whatsapp
Vkontakte
Telegram
Reddit
Pinterest
Linkedin
Hide