- Simulate by directly setting the work process
- Add up to 3 processes
- Up to 32 work units can be added for each process (simultaneous work)
- It is possible to set the movement time between process and process
- Possible to set the number of waiting work units between processes (space concept)
- It is possible to demonstrate from 1x speed to 100x speed and for a short time
Pre-calculate how long long hours of real work will take
* caution:
There may be some errors in the calculation of working hours
When demonstrating at high double speed, the accuracy is lowered
Results are approximate, not absolutely exact, and are recommended for reference.