[ Kim Taeyang T Basic Service ]
1. Benefits provided every time a power plant is connected (until budget is exhausted)
2. Free installation of monitoring equipment and support for communication costs during the contract period
3. Monitoring the status of a managed power plant with Taeyang Kim monitoring equipment installed
4. Record state change log that can be checked by inverter
5. Error, Abnormal Status Notification Talk
* Anyone with a power plant of 10kW or more can use the service regardless of region.
* 24-hour remote monitoring allows you to check the inverter change status throughout the day.
* Power plant status information divided into INFO, ERROR, and WARNNING helps to quickly determine the power plant's error response.
* You can check not only equipment error reception information, but also errors and abnormal conditions analyzed by the H Energy Data Analysis Center.
* A research team of data scientists and analysts continuously studies plant failures and anomalies.
* We continuously upgrade the AI analysis module by operating an open-source laboratory in which Korea's top engineering college researchers and researchers from all over the country can do research together.